Trimble WorksOS Help
See above for Project Settings and Excluded Elevations.
On the left-side toolbar, click the Progress Volumes icon (bar chart).
Click the More icon (vertical ellipsis).
See the help topic called Track Progress Volumes.
Next topic: Other Options